BALLAST NEDAM INTERNATIONAL – Marine Contractor

Project: San Lorenzo 500 MW Combine Cycle Gas Turbine Offshore Pipe Laying
Location: Sta. Rita Batangas Underwater Pipe Laying. March - August 2002

CW Intake Head GRP Structure

Gabion Pipe Support

CW Intake Pipe with Manhole


Prime Metro BMD Corp.

Project: Underwater Aluminum Anodes Installation 195.5 kls. Ea. 117 Pcs.
 Location: MICT Berth 7 Extension Vitas Tondo, Manila (July – August 2020)

Project: Underwater Aluminum Anodes Installation 195.5 kls. Ea. 117 Pcs.
 Location: MICT Berth 7 Extension Vitas Tondo, Manila (July – August 2020)


CMC Di RAVENNA (Philippine Branch)

Project: Underwater Demolition of RC Revetment/Rock/Diaphragm Wall
Removal/Recovery of 1300 c3 Debris & Installation Mattresses
 Location: Ipo Dam Norzagaray (May 2019 – June 2020)


STA CLARA INTERNATIONAL CORPORATION

Project: Rizal Province Water Supply Improvement Package 1 Project
Installation of Brine Outfall
 Location: Cardona, Rizal (September 2017 – June 2018)

Formworks for concrete ballast

Casting of concrete ballast

Casted ballast

Installation of ballast

Installed concrete ballasts/sinkers

Pipeline covered with boulders

Complete sinker installation

Sinking of HDPE pipeline

FREY-FIL CORPORATION

Project: Putatan Water Treatment Plant 2
Underwater Survey, Cleaning, Demolition & Installation of Precast Piers
Location: Putatan, Muntinlupa City (September 2017 – March 2018)

Demolition of concrete slab

Demolition of trash bars

Retrieval of debris

Installation of ballast

Underwater application of epoxy

Underwater drilling

Installation of precast piers

SYCAMORE INTERNATIONAL SHIPPING CORPORATION

Project: Repair of Damaged Toledo Power Company Pier Structure
Location: Toledo City, Cebu, (July 12 – December 11, 2017)

amaged Pier Deck

Demolition of Damaged Tee-Beam

nstallation of Precast Tee-Beam

Completed Repair of Damaged Toledo Power Company Pier

Repair of damaged Pile Cap

Shuttering of Concrete Side Rail

Underwater Repair of Damaged Pile

Concrete Side Rail

SB CONSTRUCTION CORPORATION

Project:Coal Unloading Jetty Offshore Corrosion Protection Application
Therma Visayas Energy Project
Location: Toledo City, Cebu Province (2016-2017) 

Wrapping pile w/ marine tape wrapping w/ PVC sheet

Cleaning of pile surface

Completed pile jacket

Underwater installation of ring band

Installation of FRP jacket

Aluminum alloy anodes

Underwater welding of anodes

Underwater welding of anodes

TVEP Coal Unloading Jetty

RIOFIL CORPORATION

Project:Retrieval Works, Restoration Works & Corrosion Protection Application
Restoration of Philippine Mining Service Corporation Port Facilities
Location: Garcia-Hernandez, Bohol (2015-2016)

Salvaging and retrieval of collapsed PMSC port facilities

Wrapping pile w/ marine tape wrapping w/ PVC sheet

Salvaging and retrieval of collapsed PMSC port facilities

Underwater welding of anodes

Salvaging and retrieval of collapsed PMSC port facilities

Restoration of damaged PMSC port facilities

Installation of petrolatum marine tape

LEIGHTON CONTRACTORS (Philippines), INC.

Project: Offshore Pile Jacket Installation Works
Therma South Power Plant Project
Location: Toril, Davao City (2014) 

Pile cleaning 

Therma South Coal Unloading Jetty

Installed HDPE pile jacket

Petrolatum marine tape

F.F CRUZ CO., INC.

Project: Rodriguez Water Treatment Plant Project & Underwater Conditional Survey/Inspection of Pier 3 Crane Rail Extension Project
Location: Lamesa Dam (2011-2012) and South Harbor, Manila (2011-2012)

La Mesa Dam

South Harbor Pier 3, 5, 9, 15 above & below Water Inspection

South Harbor Pier 3, 5, 9, 15 above & below Water Inspection

Taganito Mining Corporation (TMC)

Project: Salvage of sunken LCT vessel from capsized to upright position
Location: Surigao Del Norte (2011)

LCT-Capsized, LOA 64.750 M

LCT –Sideways B-14.00 M

LCT- Pilot House Uprigh

LCT – Re Float, Draft 3.657 M

LCT–100% Upright Floating, GT-496.42


LCT – Re Float, Draft 3.657 M

Tugboat LOA-17.16, B-3.83, GT-31.87

BDZ (Baggerwerken Decloedt en Zoon)

Project: Underwater Placement with Over Depth Capping (UPOC)
Location: Pasig River Dredging Project (2009-2010)

Spill Boom

Self Propelled Barge w/ Crane

Self Propelled Barge w/ Crane

NIDO PETROLEUM

Project: ROV Pipe line survey South Nido BW to AW
Location: Offshore Palawan. March 2010

Survey Vessel 

Oil Rig Platform 

ROV

ALCATEL/PLDT

Project: Submarine Cable Shore End Burial
Location: La Union (2009)

Supply Barge 2000 DWT 

Water Jetting

Shore end Cable 

THE PHILODRILL CORPORATION- Offshore Oil Rig Operator

Project: NDT Inspection AP, AW, BW, Matinloc Oilrig Platform Project
Location: El Nido, Palawan. May – June 2008

Nido/AP Platform

BW Platform

KEPPEL BATANGAS SHIPYARD of Singapore- Shipping Repair & Building

Project: Underwater Repair & Concrete Jacketing of Ship lift Platform Piles
Location: Bo. San Miguel, Bauan, Batangas. June - August 2006

Shipyard Slip Form

Piles Repair

Concrete Jacketing

PETRON BATAAN REFINERY part owner Saudi ARAMCO – Refinery

Project: Pull-out and Repair of SBM Submarine Hose
Location: PBR Lamao, Limay, Bataan. June-November 2006

Single Buoy Mooring

Wnderwater Buoyancy Tank

Flexible Hose, 24in dia

JFE CIVIL ENGINEERING & SERVICES CONSTRUCTION CORP. of Japan

Project: Underwater Corrosion Protection Repair & Installation of Jetty Steel Piles
Location: Mindanao 210 MW Coal Fired Power Plant Project in Villanueva, Misamis
Oriental. May-December 2005

Installed Anode Underwater

Underwater Welding Installation

File of Anodes

PHILIPPINE SINTER CORP. –Managed by Kawasaki Steel

Project: Underwater Survey and Maintenance of Main Berth Piles.
Location: Philippine Sinter Main Berth, Phividec Industrial State, Villanueva,
Misamis Oriental. September-December 2005

Unloading Jetty

Pile Marine Tape Rapping

Jetty Piles

TOYO CONSTRUCTION PTE, LTD. of Japan- Marine Contractor

Project: Underwater Cooling Water Intake Pipe & Head Structure Installation.

Location: Mindanao 210 MW Coal Fired Power Plant Project in Villanueva, Misamis
Oriental. August - November 2005

Installed Anode Underwater

CW Intake Head Steel Structure 10 Meters Dia.                 

SUMITOMO CONST. CO. LTD. / DPWH of Japan- Marine Contractor

Project: San Juanico Bridge Rehabilitation
Location: Cabalawan, Tacloban Leyte Underwater Works.
November 2001 - August 2003

​Bridge Top Deck

Repaired

Repair of Piles 

PHILIPPINE LONG DISTANCE TELEPHONE- Communication Services

Project: Repair & Installation of Submarine Cable
Location: Nasugbu-Subic DFON Submarine Link (LOOP 7) in Coordination with NTT
WE Marine. February – June 2001

Cable Protection Mattress

​ROV ​​​​

​Concrete Blocks Cable Protection

DAELIM PHILIPPINES INC. Of Korea – Marine & Civil Contractor

Project: Ilijan 1200 MW Combine Cycle Power Plant Offshore Pipe Laying
Location: Ilijan Batangas Cooling Water Intake & Discharge Underwater Pipe
Lying. August 2000 - August 2001

Installation of Pipes

​CW Intake Concrete Pipe 

Leveling of Seabed


PEOPLES ASIA CONSTRUCTION CORP. – Mechanical & Civil Contractor

Project: Caliraya Intake Rehabilitation Underwater Works & Underwater Activities
for Botocan Intake (IPMSA CBK Projects in Laguna) – Sealing of Intake Gate Panels & Sealing of Temporary Stop Plugs Respectively.
Location: Caliraya, Botokan, Kalayaan, Laguna. February - March 2001

Repair of Stop Plugs

Hydro Dam Slip Way  

Gate Panels

CNP Industries, Inc. of Korea – Marine Contractor

Project: Underwater Installation of Steel Piles Cathodic Protection
Location: Unloading Jetty Fender Piles, Ilijan Power Plant. August – October 2000

Unloading Jetty 

​ Anodes Installation

​File of Anodes

THE PHILODRILL CORPORATION- Offshore Oil Rig Operator

Project: NDT Inspection Matinloc Oilrig Platform Project (with Hallin Marine System
of Singapore Joint Venture).
Location: El Nido, Palawan. September – October 1999

Matinloc PLatform

​ Anodes Installation

​ Oil Rig

McCONNELL DOWELL PHILS. INC. of Australia- Marine Contractor

Project: Cooling Water Intake and Outfall Pipeline Underwater Works 1000 MW
Combined Cycle Power Station Project
Location: Santa Rita, Batangas City. January - May 1999

CW Intake GRP Pipe 

​Pipe Laying

​ CW Intake Manhole

JOHN HOLLAND CONSTRUCTION (PHILS.) INC. of Australia-Marine Cont. 

Project: Cooling Water Intake & Discharge Pipeline Underwater Works, 440 MW 
Mauban Quezon Coal-Fired Thermal Power Plant Project
Location: Mauban, Quezon. July - November 1998

Pipe Laying

CW Intake Steel Pipes 3 M Dia

CW Intake Steel Structure 

TOA CORPORATION of JAPAN – Marine Contractor

Project: Two (2) x 300MW National Power Corporation’s Masinloc Coal-Fired
Thermal Power Plant,
Location: Masinloc, Zambales. May 1996 - Feb. 1998

 CW Outfall Channel

CW Intake Steel Pipes 2.5 M Dia.

 Navigational Buoy

TSUNEISHI HEAVY INDUSTRIES (CEBU), INC. of Japan-Ship Building 

Project: Underwater Repair of Sheet Piles for Ship Dry-Docking
Location: Balamban, Cebu. January - March 1998

Seawall Repair 

Sheet Pile Welding

Underwater Concreting

KAJIMA-SUMITOMO JOINT VENTURE of JAPAN- Marine Contractor

Project: Second Mandaue-Mactan Bridge Pier Piles Underwater Works Project
Location: Cebu City, July - September 1997

Bridge Tower  

Bridge Pile 2.5 M Dia.

Underwater Inspection

FF CRUZ & CO., INC. - PHILIPPINES

Project: Underwater & Above Water Piles Condition Survey, Open Structural Member Damaged/Defect Survey and Dimensional & Positional Survey, and Underwater & Above Water Concrete Jacketing and Repairs for Pier 15 and 3 at ATI-Manila South Harbor. Underwater steel Pipe Cutting and Welding/Installation of Cathodic Protection Sacrificial Anodes, Two (2) x 300 MW National Power Corporation’s Masinloc Coal-Fired Thermal Power Plant
Location: Since 1996 Various Projects

Pier Deck Demolition 

Pier Piles Encapsulation Repair 

U/W Welding & Cutting

THE ZENITAKA, INC. of JAPAN – Civil Contractor

Project: Rehabilitation of Angat Afterbay Regulator Dam
Location: Plaridel, Bulacan. October-December 1997

Dam Water Ways 

 Plugged Gate

Sealed

TOYO CONSTRUCTION PTE. LTD. of Japan –Marine Contractor

Project: Cooling Water Intake & Discharge Pipeline Underwater Works, Two (2)
300 MW Combined Cycle Thermal Power Plant
Location: Limay, Bataan. March - May 1994

Pipe Laying 

​CW Intake Steel Pipe

Hauling of Pipes