Project: San Lorenzo 500 MW Combine Cycle Gas Turbine Offshore Pipe Laying
Location: Sta. Rita Batangas Underwater Pipe Laying. March - August 2002
CW Intake Head GRP Structure
Gabion Pipe Support
CW Intake Pipe with Manhole
Project: Underwater Aluminum Anodes Installation 195.5 kls. Ea. 117 Pcs.
Location: MICT Berth 7 Extension Vitas Tondo, Manila (July – August 2020)
Project: Underwater Aluminum Anodes Installation 195.5 kls. Ea. 117 Pcs.
Location: MICT Berth 7 Extension Vitas Tondo, Manila (July – August 2020)
Project: Underwater Demolition of RC Revetment/Rock/Diaphragm Wall
Removal/Recovery of 1300 c3 Debris & Installation Mattresses
Location: Ipo Dam Norzagaray (May 2019 – June 2020)
Project: Rizal Province Water Supply Improvement Package 1 Project
Installation of Brine Outfall
Location: Cardona, Rizal (September 2017 – June 2018)
Formworks for concrete ballast
Casting of concrete ballast
Casted ballast
Installation of ballast
Installed concrete ballasts/sinkers
Pipeline covered with boulders
Complete sinker installation
Sinking of HDPE pipeline
Project: Putatan Water Treatment Plant 2
Underwater Survey, Cleaning, Demolition & Installation of Precast Piers
Location: Putatan, Muntinlupa City (September 2017 – March 2018)
Demolition of concrete slab
Demolition of trash bars
Retrieval of debris
Installation of ballast
Underwater application of epoxy
Underwater drilling
Installation of precast piers
Project: Repair of Damaged Toledo Power Company Pier Structure
Location: Toledo City, Cebu, (July 12 – December 11, 2017)
amaged Pier Deck
Demolition of Damaged Tee-Beam
nstallation of Precast Tee-Beam
Completed Repair of Damaged Toledo Power Company Pier
Repair of damaged Pile Cap
Shuttering of Concrete Side Rail
Underwater Repair of Damaged Pile
Concrete Side Rail
Project:Coal Unloading Jetty Offshore Corrosion Protection Application
Therma Visayas Energy Project
Location: Toledo City, Cebu Province (2016-2017)
Wrapping pile w/ marine tape wrapping w/ PVC sheet
Cleaning of pile surface
Completed pile jacket
Underwater installation of ring band
Installation of FRP jacket
Aluminum alloy anodes
Underwater welding of anodes
Underwater welding of anodes
TVEP Coal Unloading Jetty
Project:Retrieval Works, Restoration Works & Corrosion Protection Application
Restoration of Philippine Mining Service Corporation Port Facilities
Location: Garcia-Hernandez, Bohol (2015-2016)
Salvaging and retrieval of collapsed PMSC port facilities
Wrapping pile w/ marine tape wrapping w/ PVC sheet
Salvaging and retrieval of collapsed PMSC port facilities
Underwater welding of anodes
Salvaging and retrieval of collapsed PMSC port facilities
Restoration of damaged PMSC port facilities
Installation of petrolatum marine tape
Project: Offshore Pile Jacket Installation Works
Therma South Power Plant Project
Location: Toril, Davao City (2014)
Pile cleaning
Therma South Coal Unloading Jetty
Installed HDPE pile jacket
Petrolatum marine tape
Project: Rodriguez Water Treatment Plant Project & Underwater Conditional Survey/Inspection of Pier 3 Crane Rail Extension Project
Location: Lamesa Dam (2011-2012) and South Harbor, Manila (2011-2012)
La Mesa Dam
South Harbor Pier 3, 5, 9, 15 above & below Water Inspection
South Harbor Pier 3, 5, 9, 15 above & below Water Inspection
Project: Salvage of sunken LCT vessel from capsized to upright position
Location: Surigao Del Norte (2011)
LCT-Capsized, LOA 64.750 M
LCT –Sideways B-14.00 M
LCT- Pilot House Uprigh
LCT – Re Float, Draft 3.657 M
LCT–100% Upright Floating, GT-496.42
LCT – Re Float, Draft 3.657 M
Tugboat LOA-17.16, B-3.83, GT-31.87
Project: Underwater Placement with Over Depth Capping (UPOC)
Location: Pasig River Dredging Project (2009-2010)
Spill Boom
Self Propelled Barge w/ Crane
Self Propelled Barge w/ Crane
Project: ROV Pipe line survey South Nido BW to AW
Location: Offshore Palawan. March 2010
Survey Vessel
Oil Rig Platform
ROV
Project: Submarine Cable Shore End Burial
Location: La Union (2009)
Supply Barge 2000 DWT
Water Jetting
Shore end Cable
Project: NDT Inspection AP, AW, BW, Matinloc Oilrig Platform Project
Location: El Nido, Palawan. May – June 2008
Nido/AP Platform
BW Platform
Project: Underwater Repair & Concrete Jacketing of Ship lift Platform Piles
Location: Bo. San Miguel, Bauan, Batangas. June - August 2006
Shipyard Slip Form
Piles Repair
Concrete Jacketing
Project: Pull-out and Repair of SBM Submarine Hose
Location: PBR Lamao, Limay, Bataan. June-November 2006
Single Buoy Mooring
Wnderwater Buoyancy Tank
Flexible Hose, 24in dia
Project: Underwater Corrosion Protection Repair & Installation of Jetty Steel Piles
Location: Mindanao 210 MW Coal Fired Power Plant Project in Villanueva, Misamis
Oriental. May-December 2005
Installed Anode Underwater
Underwater Welding Installation
File of Anodes
Project: Underwater Survey and Maintenance of Main Berth Piles.
Location: Philippine Sinter Main Berth, Phividec Industrial State, Villanueva,
Misamis Oriental. September-December 2005
Unloading Jetty
Pile Marine Tape Rapping
Jetty Piles
Project: Underwater Cooling Water Intake Pipe & Head Structure Installation.
Location: Mindanao 210 MW Coal Fired Power Plant Project in Villanueva, Misamis
Oriental. August - November 2005
Installed Anode Underwater
CW Intake Head Steel Structure 10 Meters Dia.
Project: San Juanico Bridge Rehabilitation
Location: Cabalawan, Tacloban Leyte Underwater Works.
November 2001 - August 2003
Bridge Top Deck
Repaired
Repair of Piles
Project: Repair & Installation of Submarine Cable
Location: Nasugbu-Subic DFON Submarine Link (LOOP 7) in Coordination with NTT
WE Marine. February – June 2001
Cable Protection Mattress
ROV
Concrete Blocks Cable Protection
Project: Ilijan 1200 MW Combine Cycle Power Plant Offshore Pipe Laying
Location: Ilijan Batangas Cooling Water Intake & Discharge Underwater Pipe
Lying. August 2000 - August 2001
Installation of Pipes
CW Intake Concrete Pipe
Leveling of Seabed
Project: Caliraya Intake Rehabilitation Underwater Works & Underwater Activities
for Botocan Intake (IPMSA CBK Projects in Laguna) – Sealing of Intake Gate Panels & Sealing of Temporary Stop Plugs Respectively.
Location: Caliraya, Botokan, Kalayaan, Laguna. February - March 2001
Repair of Stop Plugs
Hydro Dam Slip Way
Gate Panels
Project: Underwater Installation of Steel Piles Cathodic Protection
Location: Unloading Jetty Fender Piles, Ilijan Power Plant. August – October 2000
Unloading Jetty
Anodes Installation
File of Anodes
Project: NDT Inspection Matinloc Oilrig Platform Project (with Hallin Marine System
of Singapore Joint Venture).
Location: El Nido, Palawan. September – October 1999
Matinloc PLatform
Anodes Installation
Oil Rig
Project: Cooling Water Intake and Outfall Pipeline Underwater Works 1000 MW
Combined Cycle Power Station Project
Location: Santa Rita, Batangas City. January - May 1999
CW Intake GRP Pipe
Pipe Laying
CW Intake Manhole
Project: Cooling Water Intake & Discharge Pipeline Underwater Works, 440 MW
Mauban Quezon Coal-Fired Thermal Power Plant Project
Location: Mauban, Quezon. July - November 1998
Pipe Laying
CW Intake Steel Pipes 3 M Dia
CW Intake Steel Structure
Project: Two (2) x 300MW National Power Corporation’s Masinloc Coal-Fired
Thermal Power Plant,
Location: Masinloc, Zambales. May 1996 - Feb. 1998
CW Outfall Channel
CW Intake Steel Pipes 2.5 M Dia.
Navigational Buoy
Project: Underwater Repair of Sheet Piles for Ship Dry-Docking
Location: Balamban, Cebu. January - March 1998
Seawall Repair
Sheet Pile Welding
Underwater Concreting
Project: Second Mandaue-Mactan Bridge Pier Piles Underwater Works Project
Location: Cebu City, July - September 1997
Bridge Tower
Bridge Pile 2.5 M Dia.
Underwater Inspection
Project: Underwater & Above Water Piles Condition Survey, Open Structural Member Damaged/Defect Survey and Dimensional & Positional Survey, and Underwater & Above Water Concrete Jacketing and Repairs for Pier 15 and 3 at ATI-Manila South Harbor. Underwater steel Pipe Cutting and Welding/Installation of Cathodic Protection Sacrificial Anodes, Two (2) x 300 MW National Power Corporation’s Masinloc Coal-Fired Thermal Power Plant
Location: Since 1996 Various Projects
Pier Deck Demolition
Pier Piles Encapsulation Repair
U/W Welding & Cutting
Project: Rehabilitation of Angat Afterbay Regulator Dam
Location: Plaridel, Bulacan. October-December 1997
Dam Water Ways
Plugged Gate
Sealed
Project: Cooling Water Intake & Discharge Pipeline Underwater Works, Two (2)
300 MW Combined Cycle Thermal Power Plant
Location: Limay, Bataan. March - May 1994
Pipe Laying
CW Intake Steel Pipe
Hauling of Pipes