Project: San Lorenzo 500 MW Combine Cycle Gas Turbine Offshore Pipe Laying
Location: Sta. Rita Batangas Underwater Pipe Laying. March - August 2002

CW Intake Head GRP Structure

Gabion Pipe Support

CW Intake Pipe with Manhole
Project: Underwater Aluminum Anodes Installation 195.5 kls. Ea. 117 Pcs.
Location: MICT Berth 7 Extension Vitas Tondo, Manila (July – August 2020)



Project: Underwater Aluminum Anodes Installation 195.5 kls. Ea. 117 Pcs.
Location: MICT Berth 7 Extension Vitas Tondo, Manila (July – August 2020)



Project: Underwater Demolition of RC Revetment/Rock/Diaphragm Wall
Removal/Recovery of 1300 c3 Debris & Installation Mattresses
Location: Ipo Dam Norzagaray (May 2019 – June 2020)



Project: Rizal Province Water Supply Improvement Package 1 Project
Installation of Brine Outfall
Location: Cardona, Rizal (September 2017 – June 2018)

Formworks for concrete ballast

Casting of concrete ballast

Casted ballast

Installation of ballast

Installed concrete ballasts/sinkers

Pipeline covered with boulders

Complete sinker installation

Sinking of HDPE pipeline
Project: Putatan Water Treatment Plant 2
Underwater Survey, Cleaning, Demolition & Installation of Precast Piers
Location: Putatan, Muntinlupa City (September 2017 – March 2018)

Demolition of concrete slab

Demolition of trash bars

Retrieval of debris

Installation of ballast

Underwater application of epoxy

Underwater drilling

Installation of precast piers
Project: Repair of Damaged Toledo Power Company Pier Structure
Location: Toledo City, Cebu, (July 12 – December 11, 2017)

amaged Pier Deck

Demolition of Damaged Tee-Beam

nstallation of Precast Tee-Beam

Completed Repair of Damaged Toledo Power Company Pier

Repair of damaged Pile Cap

Shuttering of Concrete Side Rail

Underwater Repair of Damaged Pile

Concrete Side Rail
Project:Coal Unloading Jetty Offshore Corrosion Protection Application
Therma Visayas Energy Project
Location: Toledo City, Cebu Province (2016-2017)

Wrapping pile w/ marine tape wrapping w/ PVC sheet


Cleaning of pile surface

Completed pile jacket

Underwater installation of ring band

Installation of FRP jacket

Aluminum alloy anodes

Underwater welding of anodes

Underwater welding of anodes

TVEP Coal Unloading Jetty
Project:Retrieval Works, Restoration Works & Corrosion Protection Application
Restoration of Philippine Mining Service Corporation Port Facilities
Location: Garcia-Hernandez, Bohol (2015-2016)

Salvaging and retrieval of collapsed PMSC port facilities

Wrapping pile w/ marine tape wrapping w/ PVC sheet


Salvaging and retrieval of collapsed PMSC port facilities

Underwater welding of anodes

Salvaging and retrieval of collapsed PMSC port facilities

Restoration of damaged PMSC port facilities

Installation of petrolatum marine tape
Project: Offshore Pile Jacket Installation Works
Therma South Power Plant Project
Location: Toril, Davao City (2014)

Pile cleaning

Therma South Coal Unloading Jetty

Installed HDPE pile jacket

Petrolatum marine tape
Project: Rodriguez Water Treatment Plant Project & Underwater Conditional Survey/Inspection of Pier 3 Crane Rail Extension Project
Location: Lamesa Dam (2011-2012) and South Harbor, Manila (2011-2012)

La Mesa Dam

South Harbor Pier 3, 5, 9, 15 above & below Water Inspection

South Harbor Pier 3, 5, 9, 15 above & below Water Inspection
Project: Salvage of sunken LCT vessel from capsized to upright position
Location: Surigao Del Norte (2011)

LCT-Capsized, LOA 64.750 M

LCT –Sideways B-14.00 M

LCT- Pilot House Uprigh

LCT – Re Float, Draft 3.657 M

LCT–100% Upright Floating, GT-496.42

LCT – Re Float, Draft 3.657 M

Tugboat LOA-17.16, B-3.83, GT-31.87
Project: Underwater Placement with Over Depth Capping (UPOC)
Location: Pasig River Dredging Project (2009-2010)

Spill Boom

Self Propelled Barge w/ Crane

Self Propelled Barge w/ Crane
Project: ROV Pipe line survey South Nido BW to AW
Location: Offshore Palawan. March 2010

Survey Vessel

Oil Rig Platform

ROV
Project: Submarine Cable Shore End Burial
Location: La Union (2009)

Supply Barge 2000 DWT

Water Jetting

Shore end Cable
Project: NDT Inspection AP, AW, BW, Matinloc Oilrig Platform Project
Location: El Nido, Palawan. May – June 2008

Nido/AP Platform

BW Platform

Project: Underwater Repair & Concrete Jacketing of Ship lift Platform Piles
Location: Bo. San Miguel, Bauan, Batangas. June - August 2006

Shipyard Slip Form

Piles Repair

Concrete Jacketing
Project: Pull-out and Repair of SBM Submarine Hose
Location: PBR Lamao, Limay, Bataan. June-November 2006

Single Buoy Mooring

Wnderwater Buoyancy Tank

Flexible Hose, 24in dia
Project: Underwater Corrosion Protection Repair & Installation of Jetty Steel Piles
Location: Mindanao 210 MW Coal Fired Power Plant Project in Villanueva, Misamis
Oriental. May-December 2005

Installed Anode Underwater

Underwater Welding Installation

File of Anodes
Project: Underwater Survey and Maintenance of Main Berth Piles.
Location: Philippine Sinter Main Berth, Phividec Industrial State, Villanueva,
Misamis Oriental. September-December 2005

Unloading Jetty

Pile Marine Tape Rapping

Jetty Piles
Project: Underwater Cooling Water Intake Pipe & Head Structure Installation.
Location: Mindanao 210 MW Coal Fired Power Plant Project in Villanueva, Misamis
Oriental. August - November 2005

Installed Anode Underwater

CW Intake Head Steel Structure 10 Meters Dia.
Project: San Juanico Bridge Rehabilitation
Location: Cabalawan, Tacloban Leyte Underwater Works.
November 2001 - August 2003

Bridge Top Deck

Repaired

Repair of Piles
Project: Repair & Installation of Submarine Cable
Location: Nasugbu-Subic DFON Submarine Link (LOOP 7) in Coordination with NTT
WE Marine. February – June 2001

Cable Protection Mattress

ROV

Concrete Blocks Cable Protection
Project: Ilijan 1200 MW Combine Cycle Power Plant Offshore Pipe Laying
Location: Ilijan Batangas Cooling Water Intake & Discharge Underwater Pipe
Lying. August 2000 - August 2001

Installation of Pipes

CW Intake Concrete Pipe

Leveling of Seabed
Project: Caliraya Intake Rehabilitation Underwater Works & Underwater Activities
for Botocan Intake (IPMSA CBK Projects in Laguna) – Sealing of Intake Gate Panels & Sealing of Temporary Stop Plugs Respectively.
Location: Caliraya, Botokan, Kalayaan, Laguna. February - March 2001

Repair of Stop Plugs

Hydro Dam Slip Way

Gate Panels
Project: Underwater Installation of Steel Piles Cathodic Protection
Location: Unloading Jetty Fender Piles, Ilijan Power Plant. August – October 2000

Unloading Jetty

Anodes Installation

File of Anodes
Project: NDT Inspection Matinloc Oilrig Platform Project (with Hallin Marine System
of Singapore Joint Venture).
Location: El Nido, Palawan. September – October 1999

Matinloc PLatform

Anodes Installation

Oil Rig
Project: Cooling Water Intake and Outfall Pipeline Underwater Works 1000 MW
Combined Cycle Power Station Project
Location: Santa Rita, Batangas City. January - May 1999

CW Intake GRP Pipe

Pipe Laying

CW Intake Manhole
Project: Cooling Water Intake & Discharge Pipeline Underwater Works, 440 MW
Mauban Quezon Coal-Fired Thermal Power Plant Project
Location: Mauban, Quezon. July - November 1998

Pipe Laying

CW Intake Steel Pipes 3 M Dia

CW Intake Steel Structure
Project: Two (2) x 300MW National Power Corporation’s Masinloc Coal-Fired
Thermal Power Plant,
Location: Masinloc, Zambales. May 1996 - Feb. 1998

CW Outfall Channel

CW Intake Steel Pipes 2.5 M Dia.

Navigational Buoy
Project: Underwater Repair of Sheet Piles for Ship Dry-Docking
Location: Balamban, Cebu. January - March 1998

Seawall Repair

Sheet Pile Welding

Underwater Concreting
Project: Second Mandaue-Mactan Bridge Pier Piles Underwater Works Project
Location: Cebu City, July - September 1997

Bridge Tower

Bridge Pile 2.5 M Dia.

Underwater Inspection
Project: Underwater & Above Water Piles Condition Survey, Open Structural Member Damaged/Defect Survey and Dimensional & Positional Survey, and Underwater & Above Water Concrete Jacketing and Repairs for Pier 15 and 3 at ATI-Manila South Harbor. Underwater steel Pipe Cutting and Welding/Installation of Cathodic Protection Sacrificial Anodes, Two (2) x 300 MW National Power Corporation’s Masinloc Coal-Fired Thermal Power Plant
Location: Since 1996 Various Projects

Pier Deck Demolition

Pier Piles Encapsulation Repair

U/W Welding & Cutting
Project: Rehabilitation of Angat Afterbay Regulator Dam
Location: Plaridel, Bulacan. October-December 1997

Dam Water Ways

Plugged Gate

Sealed
Project: Cooling Water Intake & Discharge Pipeline Underwater Works, Two (2)
300 MW Combined Cycle Thermal Power Plant
Location: Limay, Bataan. March - May 1994

Pipe Laying

CW Intake Steel Pipe

Hauling of Pipes